AARON PERELSTEIN
Architecture
| Graphic Design |
Photography
![]() Rendering of Fieldhouse and TowerRendering of Fieldhouse from aerial view above softball outfield | ![]() Rendering of Indoor Athletic SpaceRegulation 200 meter track, 6 indoor tennis courts, spectator bleachers, and mezzanines | ![]() Photograph from Route 19View of softball field with press box tower, spectator deck, and field house |
---|---|---|
![]() Photograph from FieldhouseView of softball stadium, bridge to press box tower, stairs down to spectator deck | ![]() Photograph of Baseball StadiumView of baseball stadium as night with Fieldhouse beyond | ![]() Photograph of FieldhouseView of athletic entrance and MVP deck |
![]() Photograph of Indoor Athletic SpaceRegulation 200 meter track, 6 indoor tennis court, spectator bleachers, and mezzanines | ![]() Photograph of Track SurfaceView of track surface with mezzanine in background | ![]() Photograph from MezzanineView of mezzanine corridor towards fitness area |
![]() Photograph of Finess AreaView of fitness area with windows toward outdoor stadiums | ![]() Photograph of MVP Conference RoomView of MVP conference room with deck and view of outdoor stadiums | ![]() Photograph of MVP Conference RoomView of MVP conference room with mezzanine and view of indoor athletic space |
KERR-PEGULA ATHLETIC COMPLEX
AT HOUGHTON COLLEGE
The $23 million project was split into three phases. Phase 1 included the resurfacing of a multi-sport competition field. Phase 2 was the construction of new baseball and softball stadiums. The final phase, Phase 3, was the construction of a 115,000 square foot field house.
The field house includes a regulation eight lane, 200-meter track, six tennis courts, cardio and weight lifting rooms, conference room, concession stand, locker and team room facilities, and office space for the athletic department. The building is capable of accomodating events with a capacity of more than 6,000 people.
Responsible for: Revit model (schematic design through construction), graphics, submittals, construction meetings, meeting minutes, proposal requests, job drawings, specification review, punch list development, construction time lapse, and architectural photography