top of page
Rendering of Fieldhouse and Tower

Rendering of Fieldhouse and Tower

Rendering of Fieldhouse from aerial view above softball outfield

Rendering of Indoor Athletic Space

Rendering of Indoor Athletic Space

Regulation 200 meter track, 6 indoor tennis courts, spectator bleachers, and mezzanines

Photograph from Route 19

Photograph from Route 19

View of softball field with press box tower, spectator deck, and field house

Photograph from Fieldhouse

Photograph from Fieldhouse

View of softball stadium, bridge to press box tower, stairs down to spectator deck

Photograph of Baseball Stadium

Photograph of Baseball Stadium

View of baseball stadium as night with Fieldhouse beyond

Photograph of Fieldhouse

Photograph of Fieldhouse

View of athletic entrance and MVP deck

Photograph of Indoor Athletic Space

Photograph of Indoor Athletic Space

Regulation 200 meter track, 6 indoor tennis court, spectator bleachers, and mezzanines

Photograph of Track Surface

Photograph of Track Surface

View of track surface with mezzanine in background

Photograph from Mezzanine

Photograph from Mezzanine

View of mezzanine corridor towards fitness area

Photograph of Finess Area

Photograph of Finess Area

View of fitness area with windows toward outdoor stadiums

Photograph of MVP Conference Room

Photograph of MVP Conference Room

View of MVP conference room with deck and view of outdoor stadiums

Photograph of MVP Conference Room

Photograph of MVP Conference Room

View of MVP conference room with mezzanine and view of indoor athletic space

KERR-PEGULA ATHLETIC COMPLEX
AT HOUGHTON COLLEGE

The $23 million project was split into three phases. Phase 1 included the resurfacing of a multi-sport competition field. Phase 2 was the construction of new baseball and softball stadiums. The final phase, Phase 3, was the construction of a 115,000 square foot field house.

 

The field house includes a regulation eight lane, 200-meter track, six tennis courts, cardio and weight lifting rooms, conference room, concession stand, locker and team room facilities, and office space for the athletic department.  The building is capable of accomodating events with a capacity of more than 6,000 people.

 

Responsible for: Revit model (schematic design through construction), graphics, submittals, construction meetings, meeting minutes, proposal requests, job drawings, specification review, punch list development, construction time lapse, and architectural photography